久久精品国产一区二区电影,国产欧美日韩,竹菊精品久久久久久久99蜜桃,私人影院播放器

Small meteorological station
Small meteorological station

Product Center

Contact Us

Shandong Wanxiang Environmental Technology Co., Ltd

contacts :Manager LIU

Telephone :13276362033

QQ:1294284350

Company Address:The second floor of the first accelerator of the Optoelectronic Industry Park, No. 155 Incubation Second Lane, High tech Zone, Weifang City, Shandong Province

Lightning monitoring and early warning system

Lightning monitoring and early warning system

update time :2025-03-14

Model:WX-LD1

Product Price: Electronic Negotiation

Product brand: Wanxiang Environment

The lightning monitoring and early warning system is a fully digital electric field detection and lightning early warning platform with outstanding advantages such as small size, low power consumption, high reliability, and easy integration.
product details

The lightning monitoring and early warning systemis also called a lightning monitor, lightning early warning system, and the lightning monitoring and early warning system is a fully digital electric field detection and lightning early warning platform. Its core electric field detection structure is based on the principle of charge induction and developed using MEMS (micro-electromechanical systems) technology. It has no motor. Movable mechanical parts that are prone to wear and tear have outstanding advantages such as small size, low power consumption, high reliability, and easy integration.

1.Product introduction oflightning monitoring and early warning system

The lightning early warning system is a fully digital electric field detection and lightning early warning platform. Its core electric field detection structure is based on the principle of charge induction and developed using MEMS (micro-electromechanical systems) technology. It has no motors and other easily wearable movable mechanical parts, and has small size and low power consumption. , high reliability, easy integration and other outstanding advantages.The system uses electric field differentiation combined with thresholds to optimize the lightning warning algorithm. Compared with the conventional threshold method, it has a high probability of avoiding false alarm problems caused by human interference (rainy days/strong winds/snowy days/dust), etc., further improving the accuracy of early warnings. Accuracy.The lightning warning system provides accurate warnings, is easy to network, and is easy to install. It is mainly oriented to the application needs of atmospheric electric field detection and lightning local short-term early warning in the fields of aerospace and national defense, meteorology, petroleum and petrochemicals, power grids, scenic spots, mines, oil depots, and military.

2.Product composition oflightning monitoring and early warning system

1. Lightning early warning probe

2. Data processing host

3.Solar power supply system

4. Anti-direct lightning system

5. Surge system

6. Grounding system

7. Optional functions, temperature, humidity, lifting lightning rod

3.Product features oflightning monitoring and early warning system

1. Users can connect the lightning warning system probe to the computer to achieve remote monitoring.

2. Through data analysis, make more accurate judgments on thundercloud electrostatic field intensity and polarity changes.

3. This system can be connected with the sound and light alarm system

4. The system software has complete network transmission functions; data transmission completely follows the network protocol

5. Equipped with central monitoring software, users can monitor and use it through a PC

4.Technical parameters oflightning monitoring and early warning system

5.Things to note when installinglightning monitoring and early warning systems

1. Lightning warning probes should be installed on sunny days

2. The lightning warning probe should be installed outdoors where there is no obstruction and no obstructions around it.

3. It shall not be installed at the generator exhaust outlet, next to telephone poles or under high-voltage lines.

4. Under abnormal circumstances, when protruding from the ground, close to antenna poles or other equipment, the field strength and its test data may be interfered with

5. In wired mode, the wiring distance from the outdoor electric field meter probe to the indoor host is not recommended to exceed 100 meters.

6. Please consult our company for more details

7. If there are any parameter updates, we will not notify you. The right of technical explanation belongs to our company.

6.Installation stepsof lightning monitoring and early warning system

1. Take out the complete lightning warning system from the box

2. Fix the bracket to the designated installation position and secure it with bolts

3. Connect the lightning contact tip on the top of the lightning rod to the ground wire. The other end of the ground wire is introduced from inside the bracket and out from the hole at the bottom of the bracket. After installing the ground electrode and other grounding devices, connect the lightning rod to the ground wire.

4. Insert the wire of the atmospheric electric field meter probe from inside the bracket, out from the hole in the middle of the bracket, and connect it to the main control box. There are three wires in the main control box. Connect them according to their colors and insulate them.

5. Fix the solar panel to the bracket and connect the solar cable to the lead power cable according to the color.

6. Install the control box in a suitable location in the control room, usually wall-mounted.Connect the alarm wire to the control box and connect it to the control box according to the color.Connect the 220V power supply to the circuit breaker

7. Lead a network cable and a control line from the front-end main control box according to the interface, and connect them to the control box in the control room. Connect the network cable and control line according to the interface.

8. Turn on the main control box switch and indoor control box switch power.

9. Turn on the computer and enter the main control box IP into the computer.


Equipment name  Lightning warning system
Electric field measurement range  -30kV/m~30kV/m
resolution  20V/m
Accuracy  better than5%
Detection distance (radius)  15KM
Sensor weight  3kg
gross weight      50kg
Input voltage  24VDC/220VAC
Power consumption      0.65W (sensor);1.8W (system)
size  300mm(sensor);1.5m(bracket)
Operating temperature  -40℃~55℃(sensor);

-20℃~55℃(controller)

Deployment location(indoor/outdoor)
Whether to support rack deployment (indoor)  /
Shelf height      1.5m (bracket)
Management interface type      RJ45,RVV
Supported management (control) functions  Level 3 early warning threshold setting and field coefficient setting
Number and type of data interfaces  1 aviation socket, 1 network interface
Outbound data bandwidth requirements      50Mbps
Outgoing data frequency  1s
Outgoing data communication protocol>own agreement

Product address:http://m.tianxingg.com/en/leidian/871.html
  • previous page :沒有了!
  • next page :沒有了!
Hello, my friend!
What kind of support do you need? Our products is sure to satisfy you.
*Name
*Email
WeChat
Phone
Country
*Message
野外吮她的花蒂两男一女| 少年汁水四溅捣出白沫H| 被主人野外调教暴露羞辱历程 | 一路向西在线播放| 337p粉嫩大胆色噜噜噜| 猛烈h继攵禁忌h| 在线观看免费视频| 女人被添荫蒂舒服极了| 国产综合一区二区三区| 国产无套内射又大又猛又粗又爽| 国产av无码专区亚洲av| 免费b站在线观看人数在哪儿找| 偷偷鲁2020精品偷拍视频| 无人区一码二码三码四码区| 精品无码一区二区三区爱欲| 扒开老女毛荫荫的黑森林视频 | 亚洲 日韩 欧美 综合 热| 少妇大乳妓女毛片A片| 翁莹情乱第全部篇| 免费看撕开奶罩揉吮奶头视频| 我半夜摸妺妺的奶摸到高潮| 欧美三级在线播放| 无码人妻少妇色欲av一区二区 | 被下人玩弄的嫡女NP| 女人扒开屁股桶爽30分钟高潮| 黑人97人人模人人爽人人喊| 一色一伦一区二区三区| 小舞被肉干高h潮文不断| 一本色道在线久88在线观看片| 欧美极品jizzhd欧美| 女人下边紧了好还是松点好| 免费网站看v片在线18禁无码| 国产亚洲精品久久久久久| 人妻少妇被猛烈进入中文字幕| 扒开美女内裤狂揉下部| 女女百合av大片在线观看免费 | 日韩精品视频| 揉她小豆豆揉到失禁h| 久久综合狠狠综合久久综合88| 精品少妇无码av无码专区| 国模冰冰大胆瓣开下部|