久久精品国产一区二区电影,国产欧美日韩,竹菊精品久久久久久久99蜜桃,私人影院播放器

Small meteorological station
Small meteorological station

Product Center

Contact Us

Shandong Wanxiang Environmental Technology Co., Ltd

contacts :Manager LIU

Telephone :13276362033

QQ:1294284350

Company Address:The second floor of the first accelerator of the Optoelectronic Industry Park, No. 155 Incubation Second Lane, High tech Zone, Weifang City, Shandong Province

Lightning monitoring and early warning system

Lightning monitoring and early warning system

update time :2025-03-14

Model:WX-LD1

Product Price: Electronic Negotiation

Product brand: Wanxiang Environment

The lightning monitoring and early warning system is a fully digital electric field detection and lightning early warning platform with outstanding advantages such as small size, low power consumption, high reliability, and easy integration.
product details

The lightning monitoring and early warning systemis also called a lightning monitor, lightning early warning system, and the lightning monitoring and early warning system is a fully digital electric field detection and lightning early warning platform. Its core electric field detection structure is based on the principle of charge induction and developed using MEMS (micro-electromechanical systems) technology. It has no motor. Movable mechanical parts that are prone to wear and tear have outstanding advantages such as small size, low power consumption, high reliability, and easy integration.

1.Product introduction oflightning monitoring and early warning system

The lightning early warning system is a fully digital electric field detection and lightning early warning platform. Its core electric field detection structure is based on the principle of charge induction and developed using MEMS (micro-electromechanical systems) technology. It has no motors and other easily wearable movable mechanical parts, and has small size and low power consumption. , high reliability, easy integration and other outstanding advantages.The system uses electric field differentiation combined with thresholds to optimize the lightning warning algorithm. Compared with the conventional threshold method, it has a high probability of avoiding false alarm problems caused by human interference (rainy days/strong winds/snowy days/dust), etc., further improving the accuracy of early warnings. Accuracy.The lightning warning system provides accurate warnings, is easy to network, and is easy to install. It is mainly oriented to the application needs of atmospheric electric field detection and lightning local short-term early warning in the fields of aerospace and national defense, meteorology, petroleum and petrochemicals, power grids, scenic spots, mines, oil depots, and military.

2.Product composition oflightning monitoring and early warning system

1. Lightning early warning probe

2. Data processing host

3.Solar power supply system

4. Anti-direct lightning system

5. Surge system

6. Grounding system

7. Optional functions, temperature, humidity, lifting lightning rod

3.Product features oflightning monitoring and early warning system

1. Users can connect the lightning warning system probe to the computer to achieve remote monitoring.

2. Through data analysis, make more accurate judgments on thundercloud electrostatic field intensity and polarity changes.

3. This system can be connected with the sound and light alarm system

4. The system software has complete network transmission functions; data transmission completely follows the network protocol

5. Equipped with central monitoring software, users can monitor and use it through a PC

4.Technical parameters oflightning monitoring and early warning system

5.Things to note when installinglightning monitoring and early warning systems

1. Lightning warning probes should be installed on sunny days

2. The lightning warning probe should be installed outdoors where there is no obstruction and no obstructions around it.

3. It shall not be installed at the generator exhaust outlet, next to telephone poles or under high-voltage lines.

4. Under abnormal circumstances, when protruding from the ground, close to antenna poles or other equipment, the field strength and its test data may be interfered with

5. In wired mode, the wiring distance from the outdoor electric field meter probe to the indoor host is not recommended to exceed 100 meters.

6. Please consult our company for more details

7. If there are any parameter updates, we will not notify you. The right of technical explanation belongs to our company.

6.Installation stepsof lightning monitoring and early warning system

1. Take out the complete lightning warning system from the box

2. Fix the bracket to the designated installation position and secure it with bolts

3. Connect the lightning contact tip on the top of the lightning rod to the ground wire. The other end of the ground wire is introduced from inside the bracket and out from the hole at the bottom of the bracket. After installing the ground electrode and other grounding devices, connect the lightning rod to the ground wire.

4. Insert the wire of the atmospheric electric field meter probe from inside the bracket, out from the hole in the middle of the bracket, and connect it to the main control box. There are three wires in the main control box. Connect them according to their colors and insulate them.

5. Fix the solar panel to the bracket and connect the solar cable to the lead power cable according to the color.

6. Install the control box in a suitable location in the control room, usually wall-mounted.Connect the alarm wire to the control box and connect it to the control box according to the color.Connect the 220V power supply to the circuit breaker

7. Lead a network cable and a control line from the front-end main control box according to the interface, and connect them to the control box in the control room. Connect the network cable and control line according to the interface.

8. Turn on the main control box switch and indoor control box switch power.

9. Turn on the computer and enter the main control box IP into the computer.


Equipment name  Lightning warning system
Electric field measurement range  -30kV/m~30kV/m
resolution  20V/m
Accuracy  better than5%
Detection distance (radius)  15KM
Sensor weight  3kg
gross weight      50kg
Input voltage  24VDC/220VAC
Power consumption      0.65W (sensor);1.8W (system)
size  300mm(sensor);1.5m(bracket)
Operating temperature  -40℃~55℃(sensor);

-20℃~55℃(controller)

Deployment location(indoor/outdoor)
Whether to support rack deployment (indoor)  /
Shelf height      1.5m (bracket)
Management interface type      RJ45,RVV
Supported management (control) functions  Level 3 early warning threshold setting and field coefficient setting
Number and type of data interfaces  1 aviation socket, 1 network interface
Outbound data bandwidth requirements      50Mbps
Outgoing data frequency  1s
Outgoing data communication protocol>own agreement

Product address:http://m.tianxingg.com/en/leidian/871.html
  • previous page :沒有了!
  • next page :沒有了!
Hello, my friend!
What kind of support do you need? Our products is sure to satisfy you.
*Name
*Email
WeChat
Phone
Country
*Message
美国式禁忌2| 被学长抱进小树林C个爽| 天美传媒mv免费观看| 中文字幕在线播放| 荫蒂每天被男人添| 无码成人性爽xo视频在线观看| 老师好大好爽我要喷水了视频 | 和尚吮她的花蒂和奶水视频| 绯色av视频精品一区二区| 麻豆乱码国产一区二区三区| 亚洲国产成人精品无码区99| 清冷医生受h打开腿乖听话男男| 娇小videodes极品| 18禁免费吃奶摸下激烈视频| 亚洲成av人电影在线观看| 日韩高清无码| 国产又黄又大又粗的视频| 附近秒约一泡| 99精品欧美一区二区三区| 成人做受视频试看60秒| 国产精品理论片| 又大又粗又爽18禁免费看 | 亚洲va在线va天堂va无码| 国产xxxx做受视频国语对白l| 《特殊的精油按摩3》| 欧美97色伦欧美一区二区日韩| 欧美日韩在线视频| 色99蜜臀av无码波多野结衣| 丰满中国少妇和黑人玩 | 顶级私人家庭影院| 久久精品国产精品亚洲毛片| 欧美 亚洲 另类 偷偷 自拍| 高辣慎入hh出轨| 娇妻系列交换(纯肉高h)| 无码熟妇人妻av在线| 富婆性俱乐部纵欲狂| 色戒无删减版| 高龄老妇乱春小说| 一女被二男吃奶a片免费观看| 小莹客厅激情38章至50章一区| 征服同学人妇系列陈露露3|